BACK
Cases
LIST

Traps performance table

Date:2021-01-05 Visits:1998
UserUnit ParametersValve SpecificationsTimeQuantity
Taicang Port GCL Power Generation Co., Ltd.2x330MW2'' 900lb F222020/5/62
Indonesia Widaba Industrial Park Co., Ltd.5# Thermal power generation construction projectDN32 DN50 DN65 PN160 PN40 PN100 PN760 F91 A105 F222020/1/287
Indonesia Widaba Industrial Park Libai Metal Co., Ltd.1x250MW Thermal Power Construction ProjectDN32 DN50 DN65 PN160 PN40 PN100 PN760 F91 A105 F222019/11/2794
China Resources Power Hubei Co., Ltd.2×330MW1.5" 900LB A1052019/9/262
National Energy Group Jianbi Power Plant2×300MW1.5" 300lb 900lb 12Cr1Mov2019/9/202
Indonesia Vitabay Industrial Park3*250MW thermal power generation construction project group1.25" 2" 2.5" 300LB 600LB 900LB 1500LB 2500LB 4500LB F22 F91 A1052019/7/26261
Morovale Power Co., Ltd. (MPM)1*250MW 1.25" 2" 2.5" 300LB 600LB 900LB 1500LB 2500LB 4500LB F22 F91 A1052019/7/2687
Guodian County Project2×600MW1.5" 300LB A1052019/5/102
3.5 million tons of steel construction project of Indonesia Dexin Steel Co., Ltd.2*100MW Gas generator setDN15.DN20.DN25 1500LB 2500LB 3500LB A1052019/5/928
Xuzhou China Resources Power Co., Ltd.300MW2" 1.5" 600LB 900LB A105 F222019/3/74
Huadian Shaoguan Pingshi Power Plant B Plant2*300MW unit1.5 2500lb 900lb 3500lb F222018/9/2715
Green hills of indonesia2*350MW1" 1.5" 2" 2.5" 3000LB 900LB 600LB F91 A1052018/7/3010
China Resources Power (Bohai New Area) Co., Ltd.2×350MW Cogeneration unit1.25" 2500LB WB362018/7/111
Supporting energy supply project for Xinjiang Zhundong Photovoltaic Park2×15MW back pressure unit + 220T/h pulverized coal boiler1.5" 300LB F22 2" 900LB F22 1.5" 900LB F222018/4/1834
Jiangxi Guodian Fengcheng Power Plant300MW2" 900LB F222018/4/41
China Resources Power (Changshu) Co., Ltd.600MW2" 150LB A1052018/3/94
Huaibei Hushan Power Plant660MW2" 600LB A1052018/2/91
Huaibei Hushan Power Plant660MW2" 600LB A1052018/2/91
Guodian Changyuan Jingzhou Power Plant2×300MW2" 900LB F222018/1/122